Progress inside and out at Wedgewood Lodge!
October 7, 2024
Lower townhomes are under construction, too!
Baldy behind lower townhomes viewed through scaffolding on Tower
New windows and doors are installed in the Tower
The Lobby is a construction office and materials storage
Side of back townhome
Demo on the back plaza
New siding
The south elevation of the tower on August 16
Front entrance of 522 and the plaza viewed from new second floor balcony.
View from above of unit 521 and the site of the hot tubs and firepit.
Balcony of 301 looks out to the Snowflake Lift, which is currently shielded from view by colorful autumn Aspen trees
Front entrances of 530 and 529
South east side of the garage and tower
View from below
Peak 8 behind new roof and building wrap
Recycling garage
Kitchen of a unit in the tower
South side of the Tower building
North side of tower with new siding installation over Lobby entrance
Future site of the outdoor hot tubs and fire pit with the lower townhomes in the background.
Painting in progress along the townhomes on Four O’clock Road
The renovations at Wedgewood Lodge are well underway
!