Uncategorized
Progress inside and out at Wedgewood Lodge!
October 7, 2024
Kitchen of a unit in the tower
New siding
Demo on the back plaza
View from below
Balcony of 301 looks out to the Snowflake Lift, which is currently shielded from view by colorful autumn Aspen trees
Baldy behind lower townhomes viewed through scaffolding on Tower
The south elevation of the tower on August 16
View from above of unit 521 and the site of the hot tubs and firepit.
Peak 8 behind new roof and building wrap
South side of the Tower building
Side of back townhome
Painting in progress along the townhomes on Four O’clock Road
Front entrances of 530 and 529
The Lobby is a construction office and materials storage
New windows and doors are installed in the Tower
North side of tower with new siding installation over Lobby entrance
South east side of the garage and tower
Lower townhomes are under construction, too!
Recycling garage
Future site of the outdoor hot tubs and fire pit with the lower townhomes in the background.
Front entrance of 522 and the plaza viewed from new second floor balcony.
The renovations at Wedgewood Lodge are well underway
!
Check out pictures of our projects
and stay tuned for updates, details about the property, rooms, rates, and reopening.
Feel free to call us anytime (970) 453-1800 x0.